Spinning our Wheels

Spinning our Wheels is a commuting blog about the challenges of getting around Atlanta by car, bus, MARTA, bicycles and on foot written by transportation reporter David Wickert

Critical link in PATH 400 Trail clinched in Sandy Springs


A missing link between popular multi-use trails in Buckhead and Sandy Springs will soon be integrated into the PATH400 network.

The Sandy Springs City Council on Tuesday green-lighted an agreement with Livable Buckhead and the PATH Foundation to start designing a segment of trail between Loridans Drive and the Glenridge Connector.

The 2.1-mile stretch is a critical link between the terminus of the greenway as currently planned and the point where PATH400 will cross under the soon-to-be-redesigned I-285/Ga. 400 interchange. (Construction on the interchange is projected to start in 2016 and end in 2019.)

READ MORE: I-285/Ga. 400 interchange project to include bike/walk path

RELATED NEWS: Statewide trail network envisioned for Georgia

“This vote allows us to keep building momentum for PATH400,” said Denise Starling, executive director of Livable Buckhead said in a statement. “Creating regional connectivity is one of the key benefits of this project, and without a link to the I-285/GA 400 interchange we weren’t able to deliver that."

With Sandy Springs' buy-in, PATH400 will be able to cprovide access to the BeltLine, the Silver Comet Trail and other regional trails.

The project is funded by a federal grant of $496,000 and $124,000 in matching funds from the PATH Foundation.

Work is proceeding on the original 5.2-mile stretch of PATH400 as well, with 38 percent of the project either complete, under construction or mobilizing. The Loudermilk Family Foundation recently announced a $250,000 matching gift for the PATH400 capital campaign. The campaign is still working to raise another $9 million that is needed to build the greenway.

RELATED NEWS: Redesigned Ga. 400/I-285 interchange will save commuters time, money

 


Reader Comments ...